Property-first ADU planning
Can I Build an ADU on My California Property?
Screen the property before paying for a floor plan. Identify the jurisdiction, rules, site constraints, utility questions and budget evidence that determine whether an ADU is worth pursuing.
On this page
California ADU planning toolkit · Start here
Find your next step before you design.
Five short steps turn your property facts into a preliminary pathway, questions for the agency and an evidence plan. “Not sure” is a useful answer.
Loading the planning steps. If they do not appear, use the property evidence checklist below.
The short answer
Start with three separate questions.
Is an ADU allowed here?
Identify the correct city or county, then verify the ADU pathway, allowed types, size, setbacks, height, parking and occupancy or rental rules.
Can the property support it?
Check existing structures, usable space, access, slope, drainage, trees, hazards, easements, utilities and emergency access.
Does the complete budget work?
Include design, permits, site work, utilities, construction, financing, contingency and the value of alternatives you give up.
Verify rules in the right order
Separate state, local and property-specific requirements.
State baseline
Determine whether state law establishes minimum permissions, review timelines, fee rules or limits on local restrictions.
City or county rules
Confirm which jurisdiction issues the permit. Then read its current ADU standards and application instructions.
Property overlays and recorded constraints
Check hazards, historic districts, coastal or environmental areas, utility easements, covenants and other parcel-specific conditions.
Agency confirmation
Record the source, date and department. Ask focused written questions when official material is unclear.
What changes feasibility
Property facts to collect before design.
| Topic | Questions to answer | Evidence to collect in California |
|---|---|---|
| Parcel and structures | Where are the boundaries and existing buildings? Is prior work permitted? | City/county GIS and assessor records as starting points; a survey when needed, measured site plan, and building-department permit history. For previously unpermitted ADU work, record construction-date evidence and review the current legalization protections before asking the agency about its process. |
| Access | Can people, equipment and emergency responders reach the proposed area? | Site measurements, fire guidance and contractor walk-through. |
| Sewer or septic | Where is the connection? Is gravity drainage possible? Does septic capacity exist? | Sewer-provider maps, connection records and a sewer scope where needed; septic permits, system capacity records and written requirements from the responsible local environmental-health agency. |
| Electrical and water | Is existing capacity adequate? Are separate meters required or desirable? | Panel and service specifications, an electrical load assessment by a qualified professional, water service/meter information and written utility requirements. Ask the designer or building department which California energy-code requirements apply to this project. |
| Slope, drainage and soil | Will excavation, retaining, stormwater or geotechnical work be needed? | Topographic information, drainage review and professional assessment. |
| Trees and hazards | Do protected trees, wildfire, flood, coastal or other overlays affect the site? | Official maps and specialist review where warranted. |
What to do next
Move forward without paying for the wrong work.
Create a one-page property brief
Record the address, jurisdiction, household goal, desired ADU type, rough size, existing structures and known constraints.
Confirm the planning pathway
Use official sources and targeted questions. Save links, written answers and review dates in the project file.
Build an evidence-based budget
Use local allowances for construction, professional services, government fees, site work and utilities.
Engage design help at the appropriate level
Once the basic pathway is plausible, choose the professional needed to test layout, code and site assumptions.
Dynamic feasibility screening tool
Build your California ADU evidence file
Open each item to see the California rule, what to investigate, and what evidence belongs in your file. Check an item only after collecting that evidence. This is an early screening record—not a permit decision. Nothing you type or check is submitted to us.
1. Correct jurisdiction identified
Confirm who controls land use and permits.
A mailing address alone does not settle jurisdiction.
2. Current official ADU rules located
Collect the state baseline and current local instructions.
Use official sources; a builder blog or search result is not rule evidence.
3. Property boundaries and setbacks confirmed
Measure from verified lot lines—not assumed fences.
Government Code §66314(d)(7). Do not measure from a fence unless its boundary location is verified.
4. Allowed size and height confirmed
Match the concept to the correct state and local pathway.
The 800-square-foot and 16-foot standards are not an automatic permit or the only possible design.
5. Electrical service and energy path screened
Check capacity, routing, metering, and project-specific energy rules.
A panel photograph or amp rating alone does not prove available capacity.
6. Sewer or septic path confirmed
Separate physical capacity from fees and connection rules.
Government Code §66311.5. The under-750-square-foot impact-fee rule is not a universal waiver of utility work or connection charges.
7. Hazards, overlays, and recorded constraints screened
Check the parcel against every relevant official layer.
No flag found means only that the sources checked showed no flag; it does not prove that every concealed or unmapped condition is absent.
8. Complete first-pass budget prepared
Include every likely project cost—not only construction.
Government Code §66311.5. Verify current local fee schedules and utility estimates.
Method and limitations
This is a screening framework, not an approval.
California source notes added September 3, 2026: §66314(d)(7), setbacks; §66311.5, impact fees and utility charges; California laws hub and code crosswalk. This update is not a parcel-specific or municipal compliance review.
The checklist measures whether important questions have supporting evidence. It does not interpret local law, inspect the property, identify concealed conditions or replace advice from the authority having jurisdiction and qualified professionals.
Important: California ADU requirements depend on the current law, local jurisdiction, project pathway and property conditions. Verify jurisdiction-specific requirements with current official sources before purchasing plans, signing contracts or making financial commitments.