California Pre-Approved ADU Plans: City-by-City Finder

California planning directory

California Pre-Approved ADU Plans: City-by-City Finder

Compare verified city pre-approved and pre-designed ADU programs, see what the standard plan actually covers, and identify the site-specific work that still has to be reviewed before a permit can be issued.

Last regulatory review: September 5, 2026Coverage: 6 verified California city programsPrimary sources: City program pages + California HCD

The statewide baseline

Pre-approved plans can shorten design review—but they do not pre-approve your property.

California HCD’s March 2026 ADU Handbook explains that AB 1332 requires local agencies to maintain a program for preapproval of ADU plans. For a qualifying detached ADU that uses a plan already preapproved by the local agency, another California agency, or an identical plan from a previously approved detached ADU, the local agency generally must approve or deny the application within 30 days.

The key distinction: the repeatable building design may already be reviewed, but the parcel is still unique. Setbacks, placement, utilities, fire access, flood or geologic constraints, grading, easements, coastal requirements and other site-specific conditions can still affect approval.

Verified directory

The California Pre-Approved ADU Matrix

This is a curated directory of programs we have verified against current official city materials. It is not intended to list every California jurisdiction.

City / jurisdictionProgram typePlan costCurrent plan optionsWhat is already reviewedWhat still needs site reviewOfficial source
Los AngelesLADBS Standard Plan ProgramYOU-ADU is free; private-plan pricing variesLarge approved-plan pool; City-provided YOU-ADU is 455 sq. ft., 1 bedroomRepeatable building plan reviewed for applicable building, residential and green-code requirementsZoning, foundation, utilities, site placement, overlays and other parcel-specific reviewLADBS
ChicoCity pre-approved catalogFree city plans14 plan variations; one-story options at 496, 599 and 749 sq. ft., plus a 599 sq. ft. two-story over-garage optionStandard plan design; the City also states the plan designer provides energy calculations free of chargeSite plan, ECSP, setbacks, utility/sewer issues, permit review and parcel constraintsCity of Chico
Morro BayRegional pre-designed stock plansPlan sets published; verify current permit and review feesSix published plan sets: 316, 445, 626, 746, 927 and 998 sq. ft.Regional stock-plan packagePre-designed ADU submittal requirements, parcel/site review, utilities, current fees and coastal or other local constraintsCity of Morro Bay
San JoséVendor preapproved programVaries by vendorMultiple currently approved vendor plans, including 1- and 2-bedroom options; the approved list changes over timeStandard non-site-specific construction plans reviewed by City staffSite-specific location, utilities, setbacks, zoning and hazard eligibility; incomplete or exceptional projects take longerCity of San José
FresnoCity pre-approved plansFive free city plans340, 499, 625, 625-over-garage and 1,015 sq. ft.; three design elevations are offered for each planPre-approved construction drawings, including solar-plan informationPre-construction site/plot plan, setbacks, utilities, fire conditions and building-permit reviewCity of Fresno
Arroyo GrandeRegional pre-designed stock plansPlan sets available; City requires a plan-review feeSix unit types from about 316 to 1,007 sq. ft., with four architectural stylesRegional pre-designed building plansSite plan, property-line dimensions, setbacks, utilities, erosion control, easements, stormwater documents and permit reviewCity of Arroyo Grande

Reality check

What “pre-approved” actually means

1. The building is repeatable. The site is not.

A stock or vendor plan can reduce repeat architectural and structural review. If your next question is what a “free” plan actually saves, use our California pre-approved ADU plan cost guide. You still need a site plan that shows the ADU on your actual parcel, including distances to property lines and other structures.

2. Utilities stay property-specific.

Water, sewer, electrical service, meter configuration and connection routes depend on the existing property and provider. Cities can still require site-specific documentation and capacity checks.

3. Foundations can depend on site conditions.

If soils, slope, drainage, hazard conditions or the proposed foundation fall outside the assumptions of the standard plan, additional engineering or a modified submittal may be required.

Do not buy a plan before checking site eligibility. San José, for example, limits its expedited preapproved pathway for properties with certain hazard conditions, while Morro Bay projects may also need coastal and parcel-specific review.

Program details

Open the city guide before choosing a plan.

Los Angeles

LADBS offers both private Standard Plans and the free 455-sq.-ft. YOU-ADU. The repeatable building plan is pre-approved, but LADBS still reviews zoning, foundation and site-specific information for the property.

Chico

The City offers 14 plans free of charge and separately offers a site-plan/ECSP preparation path. The useful question is not just “Which floor plan?” but “Does my parcel fit the selected plan without creating access, utility or site-plan problems?”

Morro Bay

The regional program publishes six stock-plan sets, but a coastal property can add a separate layer of review. Treat the plan as a building starting point, then verify the current 2026 city checklist, parcel constraints and coastal-development path.

San José

San José uses a vendor-based system. The City preapproves standard construction plans, while homeowners still submit site-specific documents. The City says same-day permit issuance may be available when a qualifying site-specific package is accurate and complete.

Fresno

Fresno publishes five free pre-approved plans and provides its own ADU cost estimator and permit resources. The City still reviews the site/plot plan and project-specific fire, access and utility conditions.

Arroyo Grande

Arroyo Grande participates in the same regional plan effort as Morro Bay, Atascadero and Grover Beach. Its process explicitly requires a plan-review fee and a site plan showing property lines, footprint, setbacks, utilities, erosion control and easements.

Why the directory will keep changing

California requires local plan-preapproval programs, but the actual catalogs, vendors, fees and eligibility rules are local and can change. We keep this finder limited to programs we have source-checked rather than claiming statewide completeness.

Use the finder

A better sequence than downloading the first plan you like

Confirm jurisdiction

Make sure the parcel is actually inside the city whose plan program you want to use. County mailing addresses can be misleading.

Screen the property

Check available buildable area, setbacks, existing structures, access, hazards, utilities, easements and any coastal or septic issues.

Choose a plan that physically fits

Compare footprint dimensions, bedroom count, height and orientation—not just square footage.

Download the current city packet

Use the city’s current application, site-plan instructions, fee schedule and any required release or vendor forms.

Price the site-specific work

Budget for site planning, surveys, engineering where needed, utility work, permits, construction and contingency. “Free plans” do not mean a free project.

Submit one consistent package

Keep the site plan, selected stock plan, utility information and application forms aligned so corrections do not create conflicting documents.

Next planning step

Turn a stock plan into a property-specific decision.

ADU Project Planner is an independent educational resource. Pre-approved plan programs, fees and eligibility rules can change. Re-check the official city source before purchasing design services or submitting a permit application.